FG urges caution, to replace expansion joints of Lagos-Ibadan

 

The acting  Controller of Works in Lagos State, Mrs Forosola Oloyede, has appealed for patience toward the planned replacement of three expansion joints on the Lagos-Ibadan Expressway to prevent accidents and damage to vehicles at Lagos-ibadan.

Oloyede in a statement at Lagos on Thursday said the contractors on the project, Julius Berger Nigeria Plc, would on Saturday commence urgent repairs and build three expansion joints on the Ibadan-bound lane of the Kara Bridge section of the highway as long bridge.

She said this was in furtherance of the ongoing reconstruction works along the Berger-OPIC axis of the highway.

“The plan to repair works would commence on Saturday, September 3, 2022, and the general public is by this notice advised to drive with caution along this route during the period of the repair works and build some,” she said.

Oloyede said the Federal Ministry of Works was joining with relevant state and federal agencies toward creating adequate diversions points and effectively reduce traffic during period of repairs.

“While delays may be expected on the outbound lane during this period, effective and efficient traffic management would be deployed to minimise delays and ensure do flow of traffic during this period,” she said.

She appealed to motorists to obey traffic rules and traffic forces, avoid driving against traffic and maintain lane discipline around the construction zone to avert gridlock.


Post a Comment

Previous Post Next Post